Boiler Wing

Boiler Inspection

    The Boiler Inspection Wing operates under the administrative control of the Director General, Directorate General of Industries and Commerce Department, which is part of the Ministry of Industries and Commerce, Government of Balochistan. Its primary responsibility is the registration and inspection of boilers and pressure vessels.

    The wing functions in compliance with the Boilers & Pressure Vessels Act, 2015, Pakistan Boiler Rules, 2009, and Pakistan Boilers Regulations, 1951.

    Its main purpose is to ensure public safety by conducting stringent inspections of boilers and pressure vessels during initial registration and subsequent renewal of registration certificates. While the Boiler Inspection Wing ensures compliance with safety standards, the safe and efficient operation of boilers remains the responsibility of the boiler engineers employed for this purpose.


Boilers Inspection Wing Hierarchy

Related Laws

  1. Balochistan Boiler and Pressure Vessels Act,2015. (Repeal from ordinance 2002 & Boiler Act 1923.
  2. Pakistan Boiler Rules, 2009(Repeal from Boiler Rules 1930.

Balochistan Boiler& Pressure Vessels Rules 2024 (under Process).

The main functions of the Boilers Inspection Wing are;


  • Registration of Boilers and pressure vessels under section ‘7’ of the Act ibid.
  • Renewal of registration certificate under section ‘8’ of the Act ibid.
  • Enquiries of the accidents of boilers and pressure vessels


Registration 

Application

An applicant must follow these steps for the registration of a boiler:

  • The application for registration should be submitted to the Chief Inspector or to the office of the nearest Inspector.
  • In a case where the application is submitted to the Inspector, the Inspector will forward it to the Chief Inspector within two working days.
  • The application should be accompanied by the prescribed documents and registration fee.

 

Procedure for Applying

Upon receiving an application, the Chief Inspector or the Inspector schedules a date and time, within fifteen days from the date of the receipt, for the examination of the boiler.

On the date fixed for inspection, the Chief Inspector or Inspector proceeds to examine the boiler and determines the maximum pressure at which the boiler must be used. Further, the Inspector reports the result of the examination to the Chief Inspector.

 

Registration Number

The Chief Inspector after checking whether a company fulfills the eligibility criteria registers the boiler and assigns a registration number.

  • The Chief Inspector next orders for a Registration Certificate. At the time of issuance of the Registration Certificate, the Inspector enters the required particulars of the boiler engineer.
  • After receiving the registration number, the owner has to get it marked on the boiler within seven days.
  • If an examination report shows a boiler unfit for approval, the Inspector communicates the refusal with the reasons to the owner.


Requirements

  • hydraulic test approved working pressure
  • Inspection at various stages of construction
  • hydraulic test and total heating surface report
  • intended working pressure
  • Boiler description material specification
  • chemical analysis
  • destructive and non-destructive tests
  • Material specification
  • stress relieving certificate
  • X-Rays and other tests


Boiler Accessories
Description of mountings, fittings, automatic controls and steam pipe lines under Regulation No.262.

Registration fees of different / various boilers (HP, IP & LP Drum Section):

Boiler Size

Particulars of Heating Surface of Boiler

Existing Rates

Revised (New) Rates

Small

01 Sq. Feet to 100 Sq. Ft

2,000/-

5,000/-

Small

101 Sq. Feet to 300 Sq. Ft

2,400/-

6,000/-

Small

301 Sq. Feet to 500 Sq. Ft

2,600/-

7,000/-

Small

501 Sq. Feet to 700 Sq. Ft

2,800/-

8,000/-

Small

701 Sq. Feet to 900 Sq. Ft

3,000/-

9,000/-

Small

901 Sq, Feet to 1100 Sq. Ft

3,200/-

10,000/-

Medium

1101 Sq. Feet to 2000 Sq. Ft

3,600/-

12,000/-

Medium

2001 Sq. Feet to 4000 Sq. Ft

4,000/-

14,000/-

Medium

4001 Sq. Feet to 6000 Sq. Ft

4,600/-

16,000/-

Medium

6001 Sq. Feet to 8000 Sq. Ft

5,200/-

18,000/-

Large

8001 Sq. Feet to 10,000 Sq. Ft

6,000/-

20,000/-

Large

10,001 Sq Feet to 15,000 Sq. Ft

6,800/-

23,000/-

Large

15,001 Sq Feet to 20,000 Sq. Ft

8,000/-

26,000/-

Large

20,001 Sq. Feet to 25,000 Sq. Ft

9,000/-

30,000/-

High Capacity

25,0001 Sq. Feet to 30,000 Sq. Ft

11,000/-

50,000/-

High Capacity

Exceeding 30,000 Sq. Ft

12,000/-

75,000/-


Inspection fees of different / various boilers (HP, IP & LP Drum Section)

Boiler Size

Particulars of Heating Surface of Boiler

Existing Rates

Revised (New) Rates

Small

01 Sq. Feet to 100 Sq. Ft

2,700/-

2,970/-

Small

101 Sq. Feet to 300 Sq. Ft

3,750/-

4,125/-

Small

301 Sq. Feet to 500 Sq. Ft

4,500/-

4,900/-

Small

501 Sq. Feet to 700 Sq. Ft

5,250/-

6,300/-

Small

701 Sq. Feet to 900 Sq. Ft

6,000/-

7,200/-

Small

901 Sq, Feet to 1100 Sq. Ft

6,750/-

8,100/-

Medium

1101 Sq. Feet to 2000 Sq. Ft

8,750/-

10,937/-

Medium

2001 Sq. Feet to 4000 Sq. Ft

14,000/-

17,500/-

Medium

4001 Sq. Feet to 6000 Sq. Ft

17,500/-

21,875/-

Medium

6001 Sq. Feet to 8000 Sq. Ft

26,250/-

34,125/-

Large

8001 Sq. Feet to 10,000 Sq. Ft

35,000/-

45,500/-

Large

10,001 Sq Feet to 15,000 Sq. Ft

50,000/-

65,000/-

Large

15,001 Sq Feet to 20,000 Sq. Ft

50,000/-

67,500/-

Large

20,001 Sq. Feet to 25,000 Sq. Ft

50,000/-

70,000/-

High Capacity

25,0001 Sq. Feet to 30,000 Sq. Ft

60,000/-

96,000/-

High Capacity

Exceeding 30,000 Sq. Ft

60,000/-

120,000/-